Yarn Loop level guide
Yarn Loop Level 976 Walkthrough
Open the red curtain on the navy board, clear the cyan ring and peach curl under it, and leave room for linked returns.
Verified Board Notes
- Initial Layout Geometry
- A blue outline surrounds a navy panel with a peach curl, red accents and a red curtain. Fronts: blue 30, peach 10, black 50 and cyan 10.
- Goal / Target Area
- Uncover the cyan ring under the curtain and clear the diagonal peach line and the dark stitches below it.
- Opening Moves
- Send left blue 30, then the column-three black 50 and red 10, then left black 40 and red 10. Re-send black 0 and red 7, then send left purple 40 and black 50.
- Danger Zone
- A brown-purple-brown group takes three places even when only purple has yarn left. The track can stay full for a whole lap.
- Unique Mechanics
- The curtain retracts after repeated navy and black passes. If you have a rainbow spool, it can pick up dark stitches near the peach curl.
Storage: the five slots where returning bobbins park until their color is reachable again. Linked: bobbins joined by a bar leave together and take one track place each.
Quick Tips for Level 976
- Send left blue 30 at the outline before the black and red pairs.
- Send navy 17 from storage slot four. Black 26 parks in that same slot, and it goes next.
- Count all three places for the returning brown-purple-brown group, even if only purple has yarn.
How to Solve Yarn Loop Level 976 — Full Solution
- Send blue 30 from column one to work the bright blue outer edge before the dark pairs.
- Send the black 50 and red 10 pair from column three, then the black 40 and red 10 pair from the left. Re-send the first pair from storage as black 0 and red 7.
- Send left purple 40 and the black 50 it exposes. The other linked pair parks as black 0 and red 8 in slots one and two and still needs two track places.
- Send silver 10 from column three while navy and black work the upper outline. Re-send navy 17 from storage slot four, then the black 26 that takes its place. The curtain retracts to show the cyan ring.
- Send the exposed blue 30 from column three. Save the parked cyan 10 for the center.
- Send brown 20, purple 30 and brown 20 from columns one to three. With the track full and cyan 10 and cream 8 parked, keep slots three to five open for their return.
- Re-send the cyan and gold returns through the ring and band. If you have a rainbow spool, use it while cyan 4, cream 1, navy 16 and gold 6 are on the track to pull dark stitches beside the peach curl.
- When a place frees up, send cream 10 and black 50 from the two left columns. Cyan clears the central blue; dark and peach thin the diagonal.
- With only small central islands left, re-send the dark brown and send the last gray 10. Gray finishes after the dark brown runs out.
Colors in this level:
Blue, Navy, Peach, Black, Red, Cyan, Purple, Silver, Cream, Brown, Gold, Gray
Common Mistakes to Avoid
- Counting a linked black 0 as a free place. It stays with its red partner.
- Forgetting the cyan ring under the red panel. The parked cyan 10 is its own return.
Frequently Asked Questions
What should I send while the red curtain is still down?
Left blue 30 and the two black and red pairs. The curtain retracts later, during the returned navy 17 and black 26 run.
Why does a black bobbin with a zero still go around the track?
It is still linked to a red partner with yarn, so the pair takes two places.
Where does a rainbow spool help?
If you have one, use it while the small cyan, cream, navy and gold passes run around the exposed curl. It pulls dark stitches near the center.